- Farm & Garden
- Pumps & Motors
- Food Processing
- Workshop, DIY & MRO
- Lab & Measuring Tools

Brand: MECSTROKE
MECSTROKE Heavy Duty 4 Stroke 196 CC Commercial Trolley Earth Auger | Post Hole Digger With 10 Inch Double Spiral Bit
SKU: TI-MH-65793
Estimated Delivery By: Mar 11 - Mar 13 




MRP : ₹68900 ₹53000
23% OFF!
Estimated Delivery By: Mar 11 - Mar 13 
Easy Return
& Refund
& Refund

Quality
Assurance
Assurance

Trusted
Delivery
Delivery

After Sales
Assistance
Assistance

Buyer
Protection
Protection
₹53000 (Including GST)
MRP : ₹68900
23% OFF!
Get Extra ₹795 OFF on Prepaid Orders
QTY :
-
1
+
Short Description
MECSTROKE Heavy Duty 4 Stroke 196 CC Commercial Trolley Earth Auger
Post Hole Digger With 10 Inch Double Spiral Bit
Note: Image is for reference bit size will be 10 Inch
Country of origin: China
Specifications
- Brand: MECSTROKE
- Weight (Approx.) : 67 kg
- Engine Type : Single Cylinder
- Cooling Type : Air-cooled
- Fuel Type : Petrol
- Engine Oil : 4 Stroke Engine Oil (Oil No. 10W30)
- Carburetor : Diaphragm
- Ignition System : C.D.I
- Max. Torque (N.m) : 10.5
- Bit Length : 80 cm/ 2.6 foot (Approx..)
- Bit Diameter : 10 inch/ (25.4 cm)
- Bit : Bit will be double spiral
Description
Powerful 196cc 4-stroke petrol engine on commercial trolley drills precise post holes for fencing and plantations effortlessly. Delivers 60-100 holes per hour in tough soils with 10-inch (25.4 cm) double spiral bit reaching 2.6 feet deep. Fuel-efficient design uses 1 liter petrol hourly; stable trolley aids transport. Ideal for farmers, contractors, and nurseries seeking durable post hole digger performance.
Features
:- Sturdy Design
- Easy to Operate & Maintain
- Fuel Efficient
- Excellent Digging Capability
Applications
:- Used to dig soil in different kinds of soil
Usage
:Before you start:
> Fill the tank with unleaded petrol. No 2T oil needed, there is a separate chamber for pouring the engine oil (20W40).
> Wear the necessary safety items like boots, gloves, etc for protection.
> Attach the appropriate auger bit for the desired hole size.
Starting the machine:
Operator 1:
- Check fuel level and ensure the fuel line is properly connected.
- Set the choke to the "choke" position.
- Prime the engine by pumping the primer bulb if necessary.
- While firmly holding the pull cord, pull it briskly to start the engine.
- Once the engine starts, slowly transition the choke to the "run" position.
Operator 2:
- Gradually increase the engine throttle to engage the auger into the ground.
- Maintain a firm grip on the handles and use body weight to push the auger down.
> Both operators should work together to maintain a steady pace and control the direction of the hole.
> Use the depth markings on the auger to reach the desired hole depth.
> Now, gently guide the auger bit into the ground, applying slight downward pressure to initiate drilling.

Select attribute








