Upgrade your construction toolkit with the BSC POWER VR20H Concrete Vibrator, built for high performance and tough job site conditions. Equipped with a powerful electric motor and a 2-meter high-speed needle, the VR20H ensures superior compaction of freshly poured concrete by efficiently eliminating air pockets and voids. This results in denser, more durable, and smoother concrete finishes. Whether it's slabs, columns, or foundations, the VR20H delivers professional-grade results every time — quickly, safely, and with minimal effort.
Features
:- Powerful 2 HP motor for heavy-duty jobs
- 2-meter long vibrating needle for deep penetration
- High-frequency vibration eliminates air voids fast
- Rugged, shockproof housing for long life
- Easy to handle, portable design
- Minimal maintenance required
- Delivers smooth, crack-free concrete surfaces
- Ideal for continuous job site usage
- Efficient cooling system for extended runs
- Suitable for all weather and terrain conditions
Applications
:- Foundations and base slabs
- RCC columns and beams
- Retaining walls and pillars
- Bridge and flyover construction
- Road laying and precast concrete
- Industrial and commercial sites
- Basement and high-rise construction
- Dams, highways, and metro projects
Usage
:Usage Guidance (How to Use) :
- Connect the machine to a stable 220V power source.
- Ensure the needle is securely attached and free of damage.
- Hold the vibrator firmly and insert the needle vertically into wet concrete.
- Move slowly in and out to distribute vibrations and remove air bubbles.
- Cover the entire concrete area evenly without over-vibrating in one spot.
- After use, disconnect the machine and clean the needle.
Maintenance Guidance :
- Unplug the machine before any maintenance or cleaning.
- Wipe the needle and housing with water and mild soap after each use.
- Store the machine in a dry, dust-free area.
- Inspect cable, motor, and needle regularly for damage or wear.
- Apply lubricant to moving parts (as per manual) every 2-3 months.
- Avoid water entering the motor unit during cleaning.
- Check motor vents and fans for clogging or debris.
- Service every 6 months for optimal performance.