- Farm & Garden
- Pumps & Motors
- Food Processing
- Workshop, DIY & MRO
- Lab & Measuring Tools

Brand: MECSTROKE
MECSTROKE Heavy Duty 4 Stroke 196 CC Commercial Trolley Earth Auger | Post Hole Digger With 8 & 12 Inch Double Spiral Bit
SKU: TI-MH-65049
Delivery By: Mar 1 - Mar 3 




MRP : ₹72000 ₹55400
23% OFF!
Delivery By: Mar 1 - Mar 3 
Easy Return
& Refund
& Refund

Quality
Assurance
Assurance

Trusted
Delivery
Delivery

After Sales
Assistance
Assistance

Buyer
Protection
Protection
₹55400 (Including GST)
MRP : ₹72000
23% OFF!
Get Extra ₹831 OFF on Prepaid Orders
QTY :
-
1
+
Short Description
MECSTROKE Heavy Duty 4 Stroke 196 CC Commercial Trolley Earth Auger
Comes with 8 & 12 Inch Double Spiral Bit
Country of origin: China
Specifications
- Brand: MECSTROKE
- Weight (Approx.) : 75 kg
- Engine Type : Single Cylinder
- Cooling Type : Air-cooled
- Fuel Type : Petrol
- Displacement : 196 cc
- Stroke : 4
- Carburetor : Diaphragm
- Ignition System : C.D.I
- Max. Torque (N.m) : 10.5
- Bit Diameter : 8 & 12 inch Bit
Description
Unleash power with the MECSTROKE Heavy Duty 4 Stroke 196CC Commercial Trolley Earth Auger, the ultimate post hole digger for demanding tasks. Equipped with versatile 8 inch (20.3 cm) and 12 inch (30.5 cm) double spiral bits for precise drilling, plus a sturdy trolley for mobility. Perfect for farmers, contractors, and landscapers tackling fencing, planting, and construction holes with reliable 4-stroke performance and effortless soil penetration.
Features
:- Robust 196CC 4-stroke engine delivers high torque for tough soils.
- Versatile dual bits: 8 inch (20.3 cm) and 12 inch (30.5 cm) double spiral.
- Heavy-duty build with wheeled trolley for easy site transport.
Applications
:- Used to dig soil in different kinds of soil
Usage
:Before you start:
> Fill the tank with unleaded petrol. No 2T oil needed, there is a separate chamber for pouring the engine oil (20W40).
> Wear the necessary safety items like boots, gloves, etc for protection.
> Attach the appropriate auger bit for the desired hole size.
Starting the machine:
Operator 1:
- Check fuel level and ensure the fuel line is properly connected.
- Set the choke to the "choke" position.
- Prime the engine by pumping the primer bulb if necessary.
- While firmly holding the pull cord, pull it briskly to start the engine.
- Once the engine starts, slowly transition the choke to the "run" position.
Operator 2:
- Gradually increase the engine throttle to engage the auger into the ground.
- Maintain a firm grip on the handles and use body weight to push the auger down.
> Both operators should work together to maintain a steady pace and control the direction of the hole.
> Use the depth markings on the auger to reach the desired hole depth.
> Now, gently guide the auger bit into the ground, applying slight downward pressure to initiate drilling.

Select attribute






